Data center projects in Penang / North MY

Malaysia · Southeast Asia · dataset updated 2026-09-27

ArusGrid tracks 6 active data center projects in Penang / North MY, Malaysia, with 333 MW of planned IT load. Of these, 1 is operational, 1 is under construction and 4 are announced only.

The largest project is DPS Energy / Hangzhou Xinfengwei Melaka DC (MoU) at 150 MW, announced only. The operators with the most planned capacity here are DPS Energy (DPS Resources) (150 MW across 1 project), Victoria Data Centre (96 MW across 1 project) and NexQuantum 1 Sdn Bhd (Cahya Suria + Suzhou EnnoTHING JV) (32 MW across 1 project). No third party publishes a colocation vacancy rate for Penang / North MY, and ArusGrid does not estimate one.

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”.

Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
DPS Energy / Hangzhou Xinfengwei Melaka DC (MoU)MelakaAnnounced150undisclosedDPS Energy (DPS Resources)Likely
Victoria Data Centre Jasin (Melaka AI DC)JasinAnnounced96undisclosedVictoria Data Centre (Hong Kong)Likely
NexQuantum AI Digital Park NQ1Ipoh (site TBC)Announced32undisclosedNexQuantum 1 Sdn Bhd (Cahya Suria + Suzhou EnnoTHING JV)Likely
Open DC PE2Bayan LepasOperational30undisclosedOpen DC (Extreme Broadband)No signal either way
Privasia SilverstreamsBagan DatukAnnounced25undisclosedPrivasia TechnologyNo signal either way
AREA Group Delapan SBEZ Campus (ADCC)Bukit Kayu HitamUnder constructionnone publishedundisclosedAREA GroupNo signal either way

Other markets in Malaysia

Operators here with their own page

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.