ArusGridProject
Directory › Thailand › Freyr Technology (Thailand)

Freyr Technology (Thailand)

Rayong / Samut Prakan (multi-site), Rayong, Thailand · EEC (Eastern Seaboard) market · location approximate to city level

Freyr Technology (Thailand) is a data center project in Rayong / Samut Prakan (multi-site), Thailand, operated by Freyr Technology (Thailand). It is at the land and permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Open on the mapSuggest a correction
Stage
Land and permitting
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Freyr Technology (Thailand)
Colocation
AI workloads
No signal either way
Evidence grade
Corroborated
Thailand, 2026-09-24. Thailand asked developers on 4 September 2026 to pause 49 data centres under construction and froze 117 pending approvals while it writes new rules, due by mid October. The government has said it cannot legally enforce the pause. No list of affected projects has been published, so no Thai project has changed stage on this basis. A separate data centre electricity tariff has been created with no rate set.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Who is behind it

OperatorFreyr Technology (Thailand) · Colocation

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Approved by a government investment agency, 2026-01THB 6.3bn (about US$200m)

An approval figure is an incentive ceiling. It often covers a first phase and can exclude land or IT equipment.

The figure covers several facilities.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-09-11

  1. thestorythailand.com
  2. w.media
  3. baxtel.com
  4. Freyr AI accelerates Southeast Asia GPU-as-a-Service expansion with major colocation and infrastructure investment (W.Media, 2026-09-01)
  5. Ready for Service: Freyr AI Thailand B300 & GB300 Cluster and the Rise of urban AI infrastructure (W.Media, 2026-08-03)

More in EEC (Eastern Seaboard)

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-09-26.