ArusGridProject
Directory › Thailand › Bridge Data Centres Chonburi Hyperscale Campus

Bridge Data Centres Chonburi Hyperscale Campus

Khlong Tamru, Mueang Chonburi, Chonburi, Thailand · EEC (Eastern Seaboard) market · location approximate to district level

Bridge Data Centres Chonburi Hyperscale Campus is a data center project in Khlong Tamru, Mueang Chonburi, Thailand, operated by Bridge Data Centres IIO (Thailand). It is under construction. It is planned for 214 MW of IT load.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
214 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Bridge Data Centres IIO (Thailand)
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Thailand, 2026-09-24. Thailand asked developers on 4 September 2026 to pause 49 data centres under construction and froze 117 pending approvals while it writes new rules, due by mid October. The government has said it cannot legally enforce the pause. No list of affected projects has been published, so no Thai project has changed stage on this basis. A separate data centre electricity tariff has been created with no rate set.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsNo

AI workloads

StatusLikely

134MW modern greenfield hyperscale build announced 2026 by a Bain-backed hyperscale platform targeting cloud/AI demand.

Who is behind it

OperatorBridge Data Centres IIO (Thailand) · Colocation
Funder, EquityBain Capital

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Approved by a government investment agency, 2026-05THB 39,050m (about US$1.2bn)

An approval figure is an incentive ceiling. It often covers a first phase and can exclude land or IT equipment.

The figure covers the whole campus.

Who builds it
Utility infrastructureEastwater Stecon Utilities (JV of Eastwater and STECON) · Oct 2025 Confirmed source ↗
Industrial water plant and 10-year supply
Water and cooling
WaterIndustrial raw water · Eastwater Stecon Utilities · 9,000 m³ a day Confirmed source ↗
Raw water from Eastwater's network treated to industrial grade; 10-year contract from May 2026; local shortage concerns reported by Mongabay (Mar 2026)

Sources checked 2026-09-11

  1. mingtiandi.com
  2. datacenterdynamics.com
  3. stecongroup.co.th
  4. bridgedatacentres.com
  5. w.media

More in EEC (Eastern Seaboard)

Also run by Bridge Data Centres

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-09-26.