ArusGridProject
Directory › Thailand › Stratus Technology (ZData) CPGC Rayong

Stratus Technology (ZData) CPGC Rayong

CPGC Industrial Estate, Rayong, Rayong, Thailand · EEC (Eastern Seaboard) market · location approximate to city level

Stratus Technology (ZData) CPGC Rayong is a data center project in CPGC Industrial Estate, Rayong, Thailand, operated by Stratus Technology. It is at the land and permitting stage. It is planned for 203 MW of IT load.

Open on the mapSuggest a correction
Stage
Land and permitting
Planned IT load
203 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Stratus Technology
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Thailand, 2026-09-24. Thailand asked developers on 4 September 2026 to pause 49 data centres under construction and froze 117 pending approvals while it writes new rules, due by mid October. The government has said it cannot legally enforce the pause. No list of affected projects has been published, so no Thai project has changed stage on this basis. A separate data centre electricity tariff has been created with no rate set.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsNo

AI workloads

StatusLikely

>=100MW modern greenfield announced 2025 by a Chinese hyperscale platform; Tier III design stated, no density disclosure.

Who is behind it

OperatorStratus Technology · Colocation
Funder, EquityCNISP Group
Funder, EquityHongShan Capital
Funder, EquityEastern Bell Capital

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Approved by a government investment agency, 2025-06THB 23.7bn (about US$727m)

An approval figure is an incentive ceiling. It often covers a first phase and can exclude land or IT equipment.

The figure covers the whole campus.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-09-11

  1. datacenterdynamics.com
  2. mingtiandi.com
  3. datacentermap.com

More in EEC (Eastern Seaboard)

Also run by ZDATA Technologies (China)

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-09-26.