Microsoft Eco Business Park VI

Kulai, Johor, Malaysia · Johor market · location approximate to city level

Microsoft Eco Business Park VI is a data center project in Kulai, Malaysia, operated by Microsoft. It has been announced and has not yet reached the land or permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Microsoft
Hyperscaler self-build
AI workloads
Likely
Evidence grade
Sourced

How well evidenced is it

One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed client (confirmed)Yes
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesNo
Dated source in the last 24 monthsNo

AI workloads

StatusLikely

hyperscaler self-build land (post-2023)

Who is behind it

OperatorMicrosoft · Hyperscaler self-build
Client, confirmedMicrosoft

Money at this site

Announced investment, 2024-06RM402.3m (about US$85m)

The figure covers land only.

Platform deals that include it

Microsoft Malaysia program
Country programme, 2024-05
US$2.2bn

Platform capital spans several sites. It is never added to this project's own figure.

Land
Land sellerEco World Development Group Bhd · 123.14 acres · RM402.3m (≈US$91m) · Jun 2024 Confirmed source ↗
Eco Business Park VI (QUANTUM Edge), Kulai; buyer Microsoft Payments (Malaysia) Sdn Bhd; RM75 psf
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedSunway Construction Sdn Bhd · Main contractor · RM1.16bn (≈US$261m) · May 2025 source ↗
This project is one of 2 that fit. The other is Microsoft Nusa Cemerlang (Mukim Pulai).
UnconfirmedSunway Construction Sdn Bhd · Core and shell builder · RM570m (≈US$128m) · Dec 2025 source ↗
This project is one of 2 that fit. The other is Microsoft Nusa Cemerlang (Mukim Pulai).
UnconfirmedSunway Construction Sdn Bhd · Utility infrastructure · RM386m (≈US$87m) · Dec 2025 source ↗
This project is one of 2 that fit. The other is Microsoft Nusa Cemerlang (Mukim Pulai).
UnconfirmedSunway Construction Sdn Bhd · Grid and substation works · RM201.2m (≈US$45m) · Apr 2026 source ↗
This project is one of 2 that fit. The other is Microsoft Nusa Cemerlang (Mukim Pulai).
UnconfirmedSunway Construction Sdn Bhd · Grid and substation works · RM664.4m (≈US$150m) · Jun 2026 source ↗
This project is one of 2 that fit. The other is Microsoft Nusa Cemerlang (Mukim Pulai).
UnconfirmedSunway Construction Sdn Bhd · Mechanical and electrical works · RM1.02bn (≈US$230m) · Aug 2026 source ↗
This project is one of 2 that fit. The other is Microsoft Nusa Cemerlang (Mukim Pulai).

Sources checked 2026-09-11

  1. datacentermap.com
  2. datacentremagazine.com

More in Johor

Also run by Microsoft

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-09-26.