Sify Paradesipalem campus

Paradesipalem, Visakhapatnam, Andhra Pradesh, India · Visakhapatnam market · location approximate to district level

Sify Paradesipalem campus is a data center project in Paradesipalem, Visakhapatnam, India, operated by Sify Infinit Spaces. It is at the land and permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: entered the record as land and permitting on 1 August 2025. Record last checked against its sources on 2 October 2026.

Open on the mapSuggest a correction
Stage
Land and permitting
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Sify Infinit Spaces
Colocation
AI workloads
No signal either way
Evidence grade
Corroborated

Where it sits

Visakhapatnam holds 9 active projects with 2,148 MW of planned IT load between them, and Sify Paradesipalem campus has no published figure so it sits outside that ranking. Of those, 2 are under construction, 3 are at the land and permitting stage and 4 are announced only. No third party publishes a colocation vacancy rate for Visakhapatnam, and ArusGrid does not estimate one.

Sify has 4 others in India tracked by ArusGrid, including Sify Vizag AI data centre and open CLS, Sify Rabale campus and Sify Chennai 02 Siruseri campus. Named funding comes from Sify Technologies on the equity side. The named user of the compute is Meta (reported, unconfirmed).

The stage was recorded as at the land and permitting stage on 1 August 2025.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 3 public sources for this project, the latest dated 29 June 2026, and last checked the record on 2 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (reported)Yes
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectYes
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2025-08-01Land and permitting · bizzbuzz.news

Who is behind it

OperatorSify Infinit Spaces · Colocation
Funder, EquitySify Technologies

Who uses the compute

Tenant · hyperscalerMeta · reported, unconfirmed

Lease of capacity at the 500MW campus, per an Economic Times report · as of 2025-11-23

ET report via DCD 2025-11-23; neither party confirmed

Source · Meta to partner with Sify Technologies on 500MW data center in Andhra Pradesh, India - report (DCD, 2025-11-23)

Checked on 2026-10-02. No document names a confirmed user beyond the rows above.

Colocation price per kW of IT load per month

ArusGrid estimate, grade CINR 6,800 to INR 8,900 (about USD 81 to 106)

ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.

market band, hyperscale (2024-12)INR 6,800 to INR 8,900 Cushman & Wakefield for Sify Infinit Spaces, 2025-10-16
Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-02

  1. Sify's Rs 15,266 crore Vizag data centre gets land boost (Bizz Buzz, 2026-06-29)
  2. Meta to partner with Sify Technologies on 500MW data center in Andhra Pradesh, India - report (DCD, 2025-11-23)
  3. India's Sify breaks ground on 50MW data center and cable landing station in Vizag (DCD, 2025-10-14)

More in Visakhapatnam

Also run by Sify

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-10-02.