Directory › India › NCR › Yotta D4

Yotta D4 data center

Greater Noida, Uttar Pradesh, India · NCR market · location approximate to district level

Yotta D4 is a data center project in Greater Noida, India, operated by Yotta Data Services. It has been announced and has not yet reached the land or permitting stage. The published capacity figure is 120 MW, and its basis is not stated as IT load.

Latest change on record: entered the record as announced on 27 August 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
120 MW
unstated
Running now
Not disclosed
Operator
Yotta Data Services
Colocation
AI workloads
Confirmed
Evidence grade
Corroborated
Will it get built?Open question2 of 7 gates passed
✓ Land secured✓ Power arranged○ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Approvals granted.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How India approves, powers and taxes data centers is on Data center rules in India.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. On record: committed or approved capital, dated, sized phase, three or more sources, dated source in the last 24 months. Criteria.

AI workloads

StatusConfirmed

CEO Sunil Gupta told Business Standard the 120 MW D4 building will host 50,000 Vera Rubin GPUs with go live May to August 2027. Techtimes quoting a Moneycontrol interview at Global Fintech Fest Sep 2026 cites 40,000 Vera Rubin chips and the CEO saying construction is starting.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria.

Phases

D4 · Announced120 MW, target 2027

Stage history

2026-08-27Announced · business-standard.com

Who is behind it

OperatorYotta Data Services · Colocation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2026-08US$750m

Colocation price per kW of IT load per month

ArusGrid estimate, grade CINR 6,800 to INR 8,900 (about USD 81 to 106)

ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. Cost floor from the site's stated capex of US$6.3m per MW at a 12 to 14 percent yield on cost over a 80 percent NOI margin, below the band. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.

market band, hyperscale (2024-12)INR 6,800 to INR 8,900 Cushman & Wakefield for Sify Infinit Spaces, 2025-10-16
cost floor from stated capexINR 6,537 to INR 7,626
Land
Allocated byUttar Pradesh Government · 20 acres · Oct 2020 Reported source ↗
20-acre park for six buildings. Yotta credits the UP government for land allotment. Allotting body not named. Park level, not specific to D4.
Power supply
Dedicated substationNot named (220kV express feeders) · 220kV · Nov 2021 Confirmed source ↗
Option of 100% green energy for customers · Yotta says the Greater Noida park is fed by redundant 220kV express feeders and an on-site substation. Park level, not specific to D4. · Applies to the whole campus.
Water and cooling
WaterRecycled wastewater · Greater Noida Industrial Development Authority (GNIDA), treated non-potable water network Reported source ↗
Park level. These facts describe the Greater Noida Data Center Park, which D4 is planned within. D4 itself is not yet built.
CoolingClosed-loop cooling Reported source ↗
Yotta told Down To Earth the park cooling is closed loop and air cooled and needs no water for daily operations. It said about 5 lakh litres a month (about 500 m3 a month) is used for cooling, all from GNIDA's treated water network, with no groundwater or municipal drinking water. Yotta's website describes a chilled-water system.

Sources

  1. Yotta to order 50,000 Nvidia Vera Rubin GPUs for $7.5 billion (Business Standard, 2026-08-27)
  2. India's Yotta Plans 80,000 Vera Rubin GPUs (Tech Times, 2026-09-12)
  3. INTERVIEW Yotta Data Services to file DRHP with SEBI within 2 wks, says MD (Informist, 2026-07-02)
  4. Yotta Data Center, Noida: North India's first major Digital Hub (Biltrax Media, 2024-11-09)
  5. Yotta to Commence Construction of Two More Data Center Buildings in its Greater Noida DC Park (Yotta Data Services, 2021-11-29)
  6. Yotta Infrastructure to set up datacenter park in Greater Noida (EPC World, 2020-10-28)
  7. India's digital thirst: Data centres are rising in water-scarce regions — and locals are paying the price (Down To Earth, 2025-11-04)