Digital Connexion BOM10 is a data center project in Mumbai (Chandivali), India, operated by Digital Connexion. It is under construction. The only published capacity figure is 40 MW of total facility power. IT load will be lower.

Latest change on record: entered the record as under construction on 20 February 2025. Record last checked against its sources on 2 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
40 MW
Total facility power
Running now
Not disclosed
Operators rarely publish this
Operator
Digital Connexion
Joint venture
AI workloads
No signal either way
Evidence grade
Corroborated

Where it sits

Mumbai metro holds 25 active projects with 2,020 MW of planned IT load between them, and Digital Connexion BOM10 ranks 16th by planned capacity. Of those, 3 are operational, 4 are operational and expanding, 9 are under construction, 6 are at the land and permitting stage and 3 are announced only. Published colocation vacancy in Mumbai metro was 6.6% as of June 2025. Vacancy excludes hyperscaler self-build.

Digital Connexion has 1 other in India tracked by ArusGrid, including Digital Connexion MAA10. Named funding comes from Reliance Industries, Brookfield Infrastructure and Digital Realty. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as under construction on 20 February 2025.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 3 public sources for this project, the latest dated 2 October 2026, and last checked the record on 2 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

BOM10 · Under construction40 MW, target 2026

Stage history

2025-02-20Under construction · x.com

Who is behind it

OperatorDigital Connexion · Joint venture
Funder, Joint venture partnerReliance Industries
Funder, Joint venture partnerBrookfield Infrastructure
Funder, Joint venture partnerDigital Realty

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-02

  1. Construction Update from Metro Mumbai. Progress continues at BOM10 (Digital Connexion (X), 2025-02-20)
  2. BOM 10 Data Center in Mumbai (Digital Connexion, 2026-10-02)
  3. Data Center Services in Mumbai (Digital Connexion, 2026-10-02)

More in Mumbai metro

Also run by Digital Connexion

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-10-02.