BW Digital NDP1

Batam, Riau Islands, Indonesia · Batam and Bintan market · location approximate to district level

BW Digital NDP1 is a data center project in Batam, Indonesia, operated by BW Digital. It is operational and expanding. It is planned for 120 MW of IT load. The operator reports 24 MW running.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
120 MW
Running now
24 MW
Operators rarely publish this
Operator
BW Digital
Colocation
AI workloads
Confirmed
Evidence grade
Verified

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsNo

AI workloads

StatusConfirmed

Operator states NDP1 is built to Nvidia AI-factory guidelines and supports up to 140kW racks with direct liquid cooling (direct-to-chip or immersion); 20-40kW air-cooled baseline; 7m slab-to-slab, 20kN/m2 floor loading.

Phases

Phase 1 · Operational24 MW, target 2026

Who is behind it

OperatorBW Digital · Colocation
Funder, EquityBW Group

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy.

Land
Land sellerCitramas Group (Nongsa Digital Park) · 55,000 sqm · Mar 2024 Reported source ↗
More than 55,000 sqm acquired from Citramas. Tenure not disclosed.

Sources checked 2026-07-13

  1. bw-digital.com
  2. datacentermap.com
  3. datacenterdynamics.com
  4. baxtel.com

Same campus, Nongsa Digital Park

More in Batam and Bintan

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-09-26.