ArusGrid tracks 4 active data center projects operated by Evolution DC, with 404 MW of planned IT load, across Thailand, the Philippines and Vietnam. Of these, 1 is under construction, 2 are at the land and permitting stage and 1 is announced only. Projects under construction or commissioning account for 52 MW.

ArusGrid classes the operator as colocation and joint venture. Projects appear under the names Evolution Data Centres. The largest project is Evolution TH02 Bangkok at 200 MW in Bangkok metro, announced only. Named funders across its projects are Megawide Construction Corp., Evolution Data Centres, Warburg Pincus, Central Pattana, International Finance Corporation and Hathor. No tenant is disclosed at any of its projects, which is normal for colocation and says nothing about occupancy.

Open the mapRelationship graph

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
Evolution TH02 BangkokPhraeksa, Mueang Samut PrakanAnnounced200undisclosedEvolution Data CentresLikely
Evolution PH01 Manila (Gateway Business Park, General Trias)General TriasLand and permitting100undisclosedEvolution Data CentresLikely
Evolution DC / Central Pattana BangkokBang NaUnder construction52undisclosedEvolution Data CentresLikely
Evolution DC VN HCMC (VN02)Thu Duc (SHTP)Land and permitting52undisclosedEvolution Data CentresLikely

Markets where it builds

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.