ArusGridMarket
Directory › Philippines › Greater Manila

Data center projects in Greater Manila

Philippines · Southeast Asia · dataset updated 2026-09-27

ArusGrid tracks 9 active data center projects in Greater Manila, the Philippines, with 517 MW of planned IT load. Of these, 6 are operational, 1 is at the land and permitting stage, 1 is announced only and 1 is on hold. Operators have disclosed 66 MW actually running, a figure most of them do not publish.

The largest project is STT Fairview (STT GDC 'Polaris' campus) at 124 MW, operational. The operators with the most planned capacity here are VITRO (ePLDT) (150 MW across 2 projects), STT GDC (124 MW across 1 project) and Evolution DC (100 MW across 1 project). Published colocation vacancy in Greater Manila was 43.6% as of June 2026, on 90 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

Grid power for a large industrial user in the Philippines costs about US$0.12 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in the Philippines, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”.

Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
STT Fairview (STT GDC 'Polaris' campus)Quezon CityOperational12432STT GDC PhilippinesLikely
Evolution PH01 Manila (Gateway Business Park, General Trias)General TriasLand and permitting100undisclosedEvolution Data CentresLikely
VITRO General Trias (PLDT 12th data center)General TriasAnnounced100undisclosedVITRO Inc. (ePLDT / PLDT)Likely
Digital Halo MNL1CaintaOperational706.5Digital HaloLikely
VITRO Sta. Rosa (VSR)Santa RosaOperational5010VITRO Inc. (ePLDT / PLDT)Confirmed
A-FLOW ML1BiñanOperational366A-FLOW (FLOW Digital Infrastructure x AyalaLand Logistics)No signal either way
The Hive (Beeinfotech PH)Quezon City (Bridgetowne)Operational20undisclosedBee Information Technology PH (Beeinfotech)Likely
YCO Cloud Campus One (Malvar One / M1)MalvarOperational1212YCO Cloud CentersNo signal either way
EdgeConneX / Aboitiz InfraCapital MNL01Metro Manila (site not disclosed)On hold5undisclosedEdgeConneX / Aboitiz InfraCapital JVNo signal either way

Cancelled

ProjectCityStagePlanned MWRunning MWOperatorAI
Converge Parañaque hyperscale data centerParañaqueCancelled49undisclosedConverge ICT SolutionsNo signal either way

Other markets in Philippines

Operators here with their own page

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.