ArusGrid tracks 9 active data center projects in HCMC metro, Vietnam, with 622 MW of planned IT load. Of these, 2 are operational, 1 is under construction, 5 are at the land and permitting stage and 1 is announced only. Projects under construction or commissioning account for 100 MW and operational sites for 10 MW of planned capacity. Operators have disclosed 10 MW actually running, a figure most of them do not publish.
The largest project is SGI-HCM Campus (AI Data Center Complex) at 200 MW, at the land and permitting stage. The operators with the most planned capacity here are AIC-KBC (200 MW across 1 project), SAM (150 MW across 1 project) and Viettel (100 MW across 1 project). Published colocation vacancy in HCMC metro was 34.8% as of June 2026, on 33 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.
Grid power for a large industrial user in Vietnam costs about US$0.073 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Vietnam, as of 27 September 2026, is recorded as “Licence required as enforced (Country Group D:1), no named authorisation found”.
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| SGI-HCM Campus (AI Data Center Complex) | Cu Chi | Land and permitting | 200 | undisclosed | AIC / KinhBac City (KBC) JV | Likely |
| SAM DigitalHub | Tan Uyen / VSIP III | Announced | 150 | undisclosed | Saigon Asset Management (SAM) | Likely |
| Viettel Tan Phu Trung Data Center & High-Tech R&D Complex | Cu Chi | Under construction | 100 * | undisclosed | Viettel IDC (Viettel Group) | Likely |
| StarMason Data Centre Campus | Thu Duc (SHTP) | Land and permitting | 60 | undisclosed | StarMason JSC (Sembcorp Development / BB Holding JV) | Likely |
| Evolution DC VN HCMC (VN02) | Thu Duc (SHTP) | Land and permitting | 52 | undisclosed | Evolution Data Centres | Likely |
| CMC Hyperscale DC SHTP | Thu Duc (SHTP) | Land and permitting | 30 | undisclosed | CMC AI Digital Infrastructure (CMC Corporation) | Likely |
| Gaw Capital Project Vespa | Thu Duc (SHTP) | Land and permitting | 20 | undisclosed | Gaw Capital Partners | No signal either way |
| STT VNG Ho Chi Minh City 1 | District 7 (Tan Thuan EPZ) | Operational | 9.6 | 9.6 | STT VNG (ST Telemedia GDC / VNG JV) | Confirmed |
| FPT Fornix HCM02 | Thu Duc (SHTP) | Operational | none published | undisclosed | FPT Telecom (FPT Corporation) | Likely |
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| STT VNG Ho Chi Minh City 2 | District 7 (Tan Thuan EPZ) | Cancelled | 60 | undisclosed | STT VNG (ST Telemedia GDC / VNG JV) | Likely |
Viettel · Evolution DC · STT GDC
All projects in Vietnam · Full directory