ArusGrid tracks 2 active data center projects in Da Nang / Central VN, Vietnam, with 10 MW of planned IT load. Of these, 1 is at the land and permitting stage and 1 is announced only.

The largest project is AIDC DeCenter (IPTP Networks) at 10 MW, at the land and permitting stage. The operators with the most planned capacity here are IPTP Networks (10 MW across 1 project) and Vietnam Data Gen (1 project). No third party publishes a colocation vacancy rate for Da Nang / Central VN, and ArusGrid does not estimate one.

Grid power for a large industrial user in Vietnam costs about US$0.073 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Vietnam, as of 27 September 2026, is recorded as “Licence required as enforced (Country Group D:1), no named authorisation found”.

Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
AIDC DeCenter (IPTP Networks)Da Nang (Hoa Vang)Land and permitting10undisclosedIPTP NetworksLikely
Vietnam Data Gen AI Data Centre Network (Phase 1, Da Nang)Da Nang (Hoa Vang)Announcednone publishedundisclosedVietnam Data Gen (Create Capital Vietnam / Haimaker.ai JV)Likely

Other markets in Vietnam

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.