ArusGrid tracks 5 active data center projects in Dammam / Eastern Province, Saudi Arabia, with 320 MW of planned IT load. Of these, 3 are operational, 1 is under construction and 1 is at the land and permitting stage. Projects under construction or commissioning account for 100 MW and operational sites for 20 MW of planned capacity.
The largest project is Khazna Dammam campus at 200 MW, at the land and permitting stage. The operators with the most planned capacity here are Khazna (200 MW across 1 project), Humain (100 MW across 1 project) and stc (20 MW across 1 project). No third party publishes a colocation vacancy rate for Dammam / Eastern Province, and ArusGrid does not estimate one.
The US export control position for advanced AI chips in Saudi Arabia, as of 19 November 2025, is recorded as “Case-by-case authorisation only”.
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| Khazna Dammam campus | Dammam | Land and permitting | 200 | undisclosed | Khazna Data Centers | Likely |
| Humain Dammam campus | Dammam | Under construction | 100 | undisclosed | Humain | Likely |
| center3 Dammam | Dammam | Operational | 20 * | undisclosed | center3 | No signal either way |
| Aramco Digital Dammam (GroqCloud region) | Dammam | Operational | none published | undisclosed | Aramco Digital | Confirmed |
| DAMAC Digital DMM-1 (Dammam) | Dammam | Operational | none published | undisclosed | DAMAC Digital (EDGNEX) | No signal either way |