Data center projects in NEOM / Oxagon

Saudi Arabia · The Gulf · dataset updated 2026-09-27

ArusGrid tracks 1 active data center project in NEOM / Oxagon, Saudi Arabia, with 360 MW of planned IT load. It is under construction. Projects under construction or commissioning account for 360 MW.

The operators with the most planned capacity here are DataVolt (360 MW across 1 project). No third party publishes a colocation vacancy rate for NEOM / Oxagon, and ArusGrid does not estimate one.

The US export control position for advanced AI chips in Saudi Arabia, as of 19 November 2025, is recorded as “Case-by-case authorisation only”.

Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
DataVolt Oxagon AI campusOxagonUnder construction360undisclosedDataVoltConfirmed

Other markets in Saudi Arabia

Operators here with their own page

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.