ArusGridProject
Directory › Saudi Arabia › DAMAC Digital DMM-1 (Dammam)

DAMAC Digital DMM-1 (Dammam)

Dammam, Eastern Province, Saudi Arabia · Dammam / Eastern Province market · location approximate to district level

DAMAC Digital DMM-1 (Dammam) is a data center project in Dammam, Saudi Arabia, operated by DAMAC Digital (EDGNEX). It is operational. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
DAMAC Digital (EDGNEX)
Colocation
AI workloads
No signal either way
Evidence grade
Verified

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesNo
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No tenant, workload or cooling disclosure for this site.

Access to AI chips

GradeNo public signal

Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria are published on the Methodology page.

Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Case-by-case authorisation only · Case-by-case authorisation only (2025-11-19) source

Stage history

2026-06-04Operational · datacenterdynamics.com

Who is behind it

OperatorDAMAC Digital (EDGNEX) · Colocation
Funder, EquityDAMAC Group

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-09-26

  1. Edgnex rebrands to Damac Data Centres (DatacenterDynamics, 2023-02-13)
  2. Damac Digital plans 6GW data center expansion across four continents (DatacenterDynamics, 2026-06-04)

More in Dammam / Eastern Province

Also run by DAMAC Digital (EDGNEX)

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-09-26.