Data center projects in Qatar

The Gulf · dataset updated 2026-09-27

ArusGrid tracks 2 active data center projects in Qatar with 62 MW of planned IT load, spread over 1 market. Of these, 1 is operational and expanding and 1 is past financial close. Disclosed running capacity is 18 MW.

Doha is the largest market with 2 projects and 62 MW planned. The operators with the most planned capacity in the country are Meeza (62 MW).

The US export control position for advanced AI chips in Qatar, as of 27 September 2026, is recorded as “Licence required as enforced (Country Group D:4), no named authorisation found”.

Markets

MarketProjectsPlanned MWUnder construction MWOperational MWColocation vacancy
Doha262018not published

Vacancy is the share of built, leasable colocation capacity sitting empty, as published by a third party. It excludes hyperscaler self-build and is never estimated.

Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
Meeza M-VAULT 6, 7 and 8DohaFinancing closed44undisclosedMeeza QSTP LLCLikely
Meeza M-VAULT 1 to 5 (Doha portfolio)DohaExpanding1818Meeza QSTP LLCLikely

Other countries

Operators here with their own page

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.