ArusGrid tracks 2 active data center projects in Doha, Qatar, with 62 MW of planned IT load. Of these, 1 is operational and expanding and 1 is past financial close. Operators have disclosed 18 MW actually running, a figure most of them do not publish.
The largest project is Meeza M-VAULT 6, 7 and 8 at 44 MW, past financial close. The operators with the most planned capacity here are Meeza (62 MW across 2 projects). No third party publishes a colocation vacancy rate for Doha, and ArusGrid does not estimate one.
The US export control position for advanced AI chips in Qatar, as of 27 September 2026, is recorded as “Licence required as enforced (Country Group D:4), no named authorisation found”.
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| Meeza M-VAULT 6, 7 and 8 | Doha | Financing closed | 44 | undisclosed | Meeza QSTP LLC | Likely |
| Meeza M-VAULT 1 to 5 (Doha portfolio) | Doha | Expanding | 18 | 18 | Meeza QSTP LLC | Likely |