Data center projects in Bahrain

The Gulf · dataset updated 2026-09-27

ArusGrid tracks 2 active data center projects in Bahrain with 60 MW of planned IT load, spread over 1 market. Of these, 1 is under construction and 1 is on hold. Projects under construction or commissioning account for 60 MW.

Manama is the largest market with 2 projects and 60 MW planned. The operators with the most planned capacity in the country are center3 (60 MW) and AWS.

Grid power for a large industrial user in Bahrain costs about US$0.095 per kWh as of September 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Bahrain, as of 27 September 2026, is recorded as “Licence required as enforced (Country Group D:4), no named authorisation found”.

Markets

MarketProjectsPlanned MWUnder construction MWOperational MWColocation vacancy
Manama260600not published

Vacancy is the share of built, leasable colocation capacity sitting empty, as published by a third party. It excludes hyperscaler self-build and is never estimated.

Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
center3 Bahrain Data Center ParkAl QurainUnder construction60undisclosedcenter3 (stc Group)Likely
AWS Middle East (Bahrain) region, me-south-1ManamaOn holdnone publishedundisclosedAmazon Web ServicesNo signal either way

Other countries

Operators here with their own page

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.