How well evidenced is it
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
Named funderYes
Disclosed client (confirmed)Yes
Committed or approved capitalYes
Dated, sized phaseYes
Three or more sourcesNo
Dated source in the last 24 monthsNo
AI workloads
StatusConfirmed
SG's largest direct-to-chip liquid cooling deployment
Phases
Full build · Operational58 MW, target 2026
Who is behind it
OperatorNxera (Singtel) · Telco
Funder, EquitySingtel
Funder, EquityKKR
Client, confirmedUndisclosed (>90% pre-committed)
Money at this site
Debt raised, 2025-02S$643m (about US$476m)
This is the size of a loan. ArusGrid excludes it from capital spending totals.
Platform deals that include it
KKR 20% stake in Nxera
Platform capital, 2023-09US$800m
Platform capital spans several sites. It is never added to this project's own figure.
Power supply
Dual power feed, diverse incoming cable routes; PUE ~1.25
Rooftop solar; MW not stated
Water and cooling
WaterRainwater harvesting Reported source ↗ PUE 1.25 at full load; rainwater harvesting, condensate reuse, blowdown recovery (main supply not stated)
CoolingDirect liquid cooling · design PUE 1.25 Reported source ↗ Direct-to-chip liquid cooling, >30kW/rack, largest D2C deployment in SG
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedObayashi Singapore Pte Ltd · Main contractor source ↗ This project is one of 3 that fit. The others are Nxera DC West, Nxera Kim Chuan 2.