How well evidenced is it
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes
AI workloads
StatusNo signal either way
No AI tenant, workload or design disclosure. The DC-CFA2 award is gated on sustainability criteria rather than a stated AI purpose, so no inference is drawn.
Stage history
Who is behind it
OperatorKeppel Data Centres · Colocation
Funder, EquityKeppel Data Centre Fund III
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy.
Money at this site
Announced investment, 2026-08S$1bn (about US$780m)
Land
Allocated byJTC Corporation (Jurong Island low-carbon data centre park) · Aug 2026 Reported source ↗ Provisional 50MW allocation in a park JTC is developing on Jurong Island. Plot size and lease term not disclosed.
Power supply
Power allocation or plan50 MW · Aug 2026 Reported source ↗ Committed >50% of capacity from green energy (biomethane, low-carbon ammonia/hydrogen, BIPV/BAPV) · DC-CFA2 provisional 50MW allocation; liquid cooling, Green Mark DC Platinum required
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedIndustrial raw water · Jurong Island utility providers (demineralised water, seawater cooling circuits) source ↗ This project is one of 4 that fit. The others are Digital Realty Jurong Island (DC-CFA2), Equinix Jurong Island (DC-CFA2), STT GDC Jurong Island (DC-CFA2).