ArusGridProject
Directory › Malaysia › TM Nxera Iskandar Puteri

TM Nxera Iskandar Puteri

Iskandar Puteri, Johor, Malaysia · Johor market · location approximate to city level

TM Nxera Iskandar Puteri is a data center project in Iskandar Puteri, Malaysia, operated by TM Nxera (Telekom Malaysia + Singtel Nxera JV). It is under construction. It is planned for 64 MW of IT load.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
64 MW
Running now
Not disclosed
Operators rarely publish this
Operator
TM Nxera (Telekom Malaysia + Singtel Nxera JV)
Joint venture
AI workloads
Confirmed
Evidence grade
Corroborated

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusConfirmed

liquid cooling for AI densities (operator)

Phases

Phase 1 (64MW, first 20MW RFS Sep 2026) · Under construction64 MW, target 2026
Phase 2 (136MW, acceleration under discussion) · Announced136 MW

Who is behind it

OperatorTM Nxera (Telekom Malaysia + Singtel Nxera JV) · Joint venture
Funder, Joint venture partnerTelekom Malaysia
Funder, Joint venture partnerSingtel (Nxera)

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy.

Who builds it
Design and build contractorIJM Construction Sdn Bhd · RM331.7m (≈US$75m) · Jun 2024 · completed Confirmed source ↗
Iskandar Puteri DC Block 2 design and construct incl. M&E and fit-out, Tier III; Jul 2024 to 3Q2025
Power supply
Grid supplyTenaga Nasional Berhad (TNB) · 280 MW · Jan 2026 Reported source ↗
ESA for ~200MW IT campus, Iskandar Puteri · Applies to the whole campus.
Water and cooling
CoolingDirect liquid cooling Reported source ↗
Liquid cooling (facility-stated, type not detailed)

Sources checked 2026-09-11

  1. datacenterdynamics.com
  2. tmglobal.com.my
  3. TM NXERA SECURES 280MW TO POWER AI-READY, GREEN DATA CENTRE CAMPUS IN JOHOR (Telekom Malaysia, 2026-01-22)
  4. AI-ready TM Nxera data center in Johor on track for 2H 2026 rollout (Light Reading, 2026-04-17)
  5. Bullish prospects for TM earnings (The Star, 2026-08-24)

More in Johor

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-09-26.