ArusGridProject
Directory › Malaysia › Epoch Digital EMY1

Epoch Digital EMY1

Iskandar Puteri (Gelang Patah), Johor, Malaysia · Johor market · location approximate to district level

Epoch Digital EMY1 is a data center project in Iskandar Puteri (Gelang Patah), Malaysia, operated by Epoch Digital (Actis platform). It is under construction. It is planned for 120 MW of IT load.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
120 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Epoch Digital (Actis platform)
Colocation
AI workloads
Likely
Evidence grade
Corroborated

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsNo

AI workloads

StatusLikely

120MW modern greenfield (2023+)

Who is behind it

OperatorEpoch Digital (Actis platform) · Colocation
Funder, EquityActis

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-09-11

  1. epochdigital.org
  2. datacentermap.com
  3. datacenterdynamics.com

More in Johor

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-09-26.