ArusGridProject
Directory › Malaysia › BrightRay Sedenak Campus (MY-01/02/03)

BrightRay Sedenak Campus (MY-01/02/03)

Sedenak (Kulai), Johor, Malaysia · Johor market · location approximate to district level

BrightRay Sedenak Campus (MY-01/02/03) is a data center project in Sedenak (Kulai), Malaysia, operated by BrightRay (Shanghai DC-Science). It is operational and expanding. It is planned for 90 MW of IT load.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
90 MW
Running now
Not disclosed
Operators rarely publish this
Operator
BrightRay (Shanghai DC-Science)
Colocation
AI workloads
No signal either way
Evidence grade
Verified

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesNo
Dated source in the last 24 monthsNo

AI workloads

StatusNo signal either way

no cooling/density/tenant signal published

Phases

MY-01 (prefab, 8-month build) · OperationalSize not published, target 2025
MY-02 · AnnouncedSize not published
MY-03 · AnnouncedSize not published

Who is behind it

OperatorBrightRay (Shanghai DC-Science) · Colocation

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-07-12

  1. datacenterdynamics.com
  2. w.media

More in Johor

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-09-26.