TCS HyperVault Anakapalli data center

Anakapalli district, Andhra Pradesh, India · Visakhapatnam market · location approximate to district level

TCS HyperVault Anakapalli is a data center project in Anakapalli district, India, operated by HyperVault (TCS). It is at the land and permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: entered the record as land and permitting on 21 July 2026. Record last checked against its sources on 2 October 2026.

Open on the mapSuggest a correction
Stage
Land and permitting
Planned IT load
Not published
unstated
Running now
Not disclosed
Operators rarely publish this
Operator
HyperVault (TCS)
Colocation
AI workloads
Likely
Evidence grade
Corroborated

Where it sits

Visakhapatnam holds 8 active projects with 2,148 MW of planned IT load between them, and TCS HyperVault Anakapalli has no published figure so it sits outside that ranking. Of those, 2 are under construction, 2 are at the land and permitting stage and 4 are announced only. No third party publishes a colocation vacancy rate for Visakhapatnam, and ArusGrid does not estimate one.

HyperVault has 1 other in India tracked by ArusGrid, including TCS HyperVault Hyderabad AI campus. Named funding comes from Tata Consultancy Services and TPG on the equity side. The named user of the compute is OpenAI (reported, unconfirmed).

The stage was recorded as at the land and permitting stage on 21 July 2026.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 2 public sources for this project, the latest dated 21 July 2026, and last checked the record on 2 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (reported)Yes
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesNo
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Reported OpenAI anchor tenancy, not confirmed by TCS or OpenAI at this site.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectYes
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

OpenAI initial · Announced100 MW

Stage history

2026-07-21Land and permitting · w.media

Who is behind it

OperatorHyperVault (TCS) · Colocation
Funder, EquityTata Consultancy Services
Funder, EquityTPG

Who uses the compute

Tenant · AI labOpenAI · reported, unconfirmed

as of 2026-07-21

Press reports say OpenAI will be HyperVault's first customer beginning with 100 MW scalable to 1 GW, site link to Anakapalli is reported not filed

Source · TCS adds Anakapalli and Pune sites to fuel its data center push (W.Media, 2026-07-21)

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-02

  1. TCS adds Anakapalli and Pune sites to fuel its data center push (W.Media, 2026-07-21)
  2. TCS secures Vizag and Pune land parcels as OpenAI India data centre plan advances (CXO DigitalPulse, 2026-07-20)

More in Visakhapatnam

Also run by HyperVault

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-10-02.