ArusGridProject
Directory › India › Visakhapatnam › CtrlS Anakapalle

CtrlS Anakapalle data center

Rambilli, Andhra Pradesh, India · Visakhapatnam market · location approximate to district level

CtrlS Anakapalle is a data center project in Rambilli, India, operated by CtrlS Datacenters. It has been announced and has not yet reached the land or permitting stage. The published capacity figure is 100 MW, and its basis is not stated as IT load.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
100 MW
unstated
Running now
Not disclosed
Operators rarely publish this
Operator
CtrlS Datacenters
Colocation
AI workloads
Likely
Evidence grade
Sourced

Where it sits

Visakhapatnam holds 7 active projects with 2,148 MW of planned IT load between them, and CtrlS Anakapalle ranks 4th by planned capacity. Of those, 2 are under construction and 5 are announced only. No third party publishes a colocation vacancy rate for Visakhapatnam, and ArusGrid does not estimate one.

It is the only Pioneer Group project ArusGrid tracks. It sits on the APIIC Industrial Park Rambilli. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as announced only on 29 June 2026. The money on record is INR 2,788.3 as of June 2026, a government approval ceiling.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 1 public source for this project, the latest dated 29 June 2026, and last checked the record on 1 October 2026.

How well evidenced is it

One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesNo
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

100 MW modern greenfield campus approved Jun 2026.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2026-06-29Announced · deccanchronicle.com

Who is behind it

OperatorCtrlS Datacenters · Colocation

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Approved by a government investment agency, 2026-06INR 2,788.3

An approval figure is an incentive ceiling. It often covers a first phase and can exclude land or IT equipment.

The figure covers the whole campus.

Land
Allocated byAPIIC · 49.93 acres · Jun 2026 Reported source ↗
Site in APIIC Industrial Park, Rambilli. Allotment terms not published.

Sources checked 2026-10-01

  1. AP Approves Sify's Rs 15,266-Crore Data Centre Expansion, Clears 3 Other Tech Projects (Deccan Chronicle, 2026-06-29)

More in Visakhapatnam

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-10-01.