ArusGridOperator
Directory › Operators › YTL

YTL data center projects

Malaysia · dataset updated 2026-09-27

ArusGrid tracks 2 active data center projects operated by YTL, with 500 MW of planned IT load, across Malaysia. Of these, 1 is operational and expanding and 1 is announced only. Disclosed running capacity is 150 MW.

ArusGrid classes the operator as colocation. Projects appear under the names YTL Power (SIPP Power Sdn Bhd, 70% YTL Power) and YTL Power (YTL Data Center Holdings). The largest project is YTL Green Data Center Park at 500 MW in Johor, operational and expanding. AI workloads are confirmed at 1 site. Named funders across its projects are YTL Power International and JLand Group (Johor Corporation). Disclosed tenants across its projects are Sea Ltd.

Open the mapRelationship graph

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
YTL Green Data Center ParkKulaiExpanding500150YTL Power (YTL Data Center Holdings)Confirmed
YTL Power Sedenak Tech Park West CampusSedenak (Kulai)Announcednone publishedundisclosedYTL Power (SIPP Power Sdn Bhd, 70% YTL Power)Likely

Markets where it builds

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.