ArusGridOperator
Directory › Operators › Racks Central

Racks Central data center projects

Indonesia and Malaysia · dataset updated 2026-09-27

ArusGrid tracks 2 active data center projects operated by Racks Central, with 165 MW of planned IT load, across Indonesia and Malaysia. Of these, 1 is under construction and 1 is at the land and permitting stage. Projects under construction or commissioning account for 70 MW.

ArusGrid classes the operator as colocation. Projects appear under the names Racks Central (Singapore). The largest project is Racks Central Batam (RCBI) at 95 MW in Batam and Bintan, at the land and permitting stage. AI workloads are confirmed at 1 site. Named funders across its projects are China-ASEAN Fund II (CAF II, ESR-linked). No tenant is disclosed at any of its projects, which is normal for colocation and says nothing about occupancy.

Open the mapRelationship graph

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
Racks Central Batam (RCBI)BatamLand and permitting95undisclosedRacks CentralLikely
Racks Central Johor CampusPasir GudangUnder construction70undisclosedRacks Central (Singapore)Confirmed

Markets where it builds

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.