ArusGrid tracks 2 active data center projects operated by NEXTDC, with 65 MW of planned IT load, across Malaysia and Thailand. Of these, 1 is operational and expanding and 1 is at the land and permitting stage. Disclosed running capacity is 15 MW.

ArusGrid classes the operator as colocation. The largest project is NEXTDC KL1 at 65 MW in Klang Valley, operational and expanding. No tenant is disclosed at any of its projects, which is normal for colocation and says nothing about occupancy.

Open the mapRelationship graph

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
NEXTDC KL1Petaling JayaExpanding6515NEXTDCLikely
NEXTDC Bangkok (BKK1)Bangkok (north/north-east fringe)Land and permittingnone publishedundisclosedNEXTDCLikely

Markets where it builds

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.