ArusGridOperator
Directory › DAMAC Digital (EDGNEX) › Saudi Arabia

DAMAC Digital (EDGNEX) data centers in Saudi Arabia

Saudi Arabia · dataset updated 2026-10-02

ArusGrid tracks 2 active data center projects operated by DAMAC Digital (EDGNEX) in Saudi Arabia, with 20 MW of planned IT load. Of these, 2 are operational.

Its Saudi Arabia projects sit in Riyadh and Dammam / Eastern Province. The largest is DAMAC Digital RUH-1 (Riyadh Industrial City 2) at 20 MW, operational. Outside Saudi Arabia, DAMAC Digital (EDGNEX) has 5 active projects on record in Thailand, Indonesia and Malaysia.

Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
DAMAC Digital RUH-1 (Riyadh Industrial City 2)RiyadhOperational20undisclosedDAMAC Digital (EDGNEX)No signal either way
DAMAC Digital DMM-1 (Dammam)DammamOperationalnone publishedundisclosedDAMAC Digital (EDGNEX)No signal either way

Markets

DAMAC Digital (EDGNEX) in other countries

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.