AirTrunk data centers in Malaysia

Malaysia · dataset updated 2026-10-02

ArusGrid tracks 4 active data center projects operated by AirTrunk in Malaysia, with 700 MW of planned IT load. Of these, 1 is operational and expanding, 1 is under construction and 2 are announced only. Projects under construction or commissioning account for 270 MW. Disclosed running capacity is 50 MW.

Its Malaysia projects sit in Johor. The largest is AirTrunk JHB2 at 270 MW, under construction. Disclosed tenants in Malaysia are ByteDance. Outside Malaysia, AirTrunk has 6 active projects on record in India, Singapore and Saudi Arabia.

Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
AirTrunk JHB2Iskandar PuteriUnder construction270undisclosedAirTrunkConfirmed
AirTrunk JHB1Iskandar PuteriExpanding15050AirTrunkConfirmed
AirTrunk JHB4Iskandar PuteriAnnounced142undisclosedAirTrunkConfirmed
AirTrunk JHB3Iskandar PuteriAnnounced138undisclosedAirTrunkConfirmed

Markets

AirTrunk in other countries

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.