AIMS (TIME) data center projects

Malaysia · dataset updated 2026-09-27

ArusGrid tracks 2 active data center projects operated by AIMS (TIME), with 200 MW of planned IT load, across Malaysia. Of these, 1 is operational and expanding and 1 is at the land and permitting stage.

ArusGrid classes the operator as colocation. Projects appear under the names AIMS Data Centre (TIME dotCom). The largest project is AIMS Cyberjaya AI Data Centre (200MW) at 200 MW in Klang Valley, at the land and permitting stage. AI workloads are confirmed at 1 site. Named funders across its projects are TIME dotCom and DigitalBridge. No tenant is disclosed at any of its projects, which is normal for colocation and says nothing about occupancy.

Open the mapRelationship graph

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
AIMS Cyberjaya AI Data Centre (200MW)CyberjayaLand and permitting200undisclosedAIMS Data Centre (TIME dotCom)Confirmed
AIMS Cyberjaya (Blocks 1-3)CyberjayaExpandingnone publishedundisclosedAIMS Data Centre (TIME dotCom)No signal either way

Markets where it builds

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.