ArusGrid tracks 5 active data center projects in Thu Duc, Vietnam, with 162 MW of planned IT load. Of these, 1 is operational and 4 are at the land and permitting stage.

Thu Duc sits in the HCMC metro market, which is the level at which brokers publish vacancy and ArusGrid compares supply. The largest project is StarMason Data Centre Campus at 60 MW, at the land and permitting stage. The operators with the most planned capacity here are StarMason (60 MW across 1 project), Evolution DC (52 MW across 1 project) and CMC (30 MW across 1 project).

Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
StarMason Data Centre CampusThu Duc (SHTP)Land and permitting60undisclosedStarMason JSC (Sembcorp Development / BB Holding JV)Likely
Evolution DC VN HCMC (VN02)Thu Duc (SHTP)Land and permitting52undisclosedEvolution Data CentresLikely
CMC Hyperscale DC SHTPThu Duc (SHTP)Land and permitting30undisclosedCMC AI Digital Infrastructure (CMC Corporation)Likely
Gaw Capital Project VespaThu Duc (SHTP)Land and permitting20undisclosedGaw Capital PartnersNo signal either way
FPT Fornix HCM02Thu Duc (SHTP)Operationalnone publishedundisclosedFPT Telecom (FPT Corporation)Likely

Market pages

Other cities in Vietnam

Operators here with their own page

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.