ArusGrid tracks 5 active data center projects in Thu Duc, Vietnam, with 162 MW of planned IT load. Of these, 1 is operational and 4 are at the land and permitting stage.
Thu Duc sits in the HCMC metro market, which is the level at which brokers publish vacancy and ArusGrid compares supply. The largest project is StarMason Data Centre Campus at 60 MW, at the land and permitting stage. The operators with the most planned capacity here are StarMason (60 MW across 1 project), Evolution DC (52 MW across 1 project) and CMC (30 MW across 1 project).
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| StarMason Data Centre Campus | Thu Duc (SHTP) | Land and permitting | 60 | undisclosed | StarMason JSC (Sembcorp Development / BB Holding JV) | Likely |
| Evolution DC VN HCMC (VN02) | Thu Duc (SHTP) | Land and permitting | 52 | undisclosed | Evolution Data Centres | Likely |
| CMC Hyperscale DC SHTP | Thu Duc (SHTP) | Land and permitting | 30 | undisclosed | CMC AI Digital Infrastructure (CMC Corporation) | Likely |
| Gaw Capital Project Vespa | Thu Duc (SHTP) | Land and permitting | 20 | undisclosed | Gaw Capital Partners | No signal either way |
| FPT Fornix HCM02 | Thu Duc (SHTP) | Operational | none published | undisclosed | FPT Telecom (FPT Corporation) | Likely |