ArusGridCity
Directory › Malaysia › Johor › Kulai

Data centers in Kulai

Malaysia · dataset updated 2026-10-02

ArusGrid tracks 3 active data center projects in Kulai, Malaysia, with 500 MW of planned IT load. Of these, 1 is operational and expanding and 2 are announced only. Operators have disclosed 150 MW actually running.

Kulai sits in the Johor market, which is the level at which brokers publish vacancy and ArusGrid compares supply. The largest project is YTL Green Data Center Park at 500 MW, operational and expanding. The operators with the most planned capacity here are YTL (500 MW across 1 project), Global Switch (1 project) and Microsoft (1 project).

Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
YTL Green Data Center ParkKulaiExpanding500150YTL Power (YTL Data Center Holdings)Confirmed
Global Switch JohorKulaiAnnouncednone publishedundisclosedGlobal SwitchNo signal either way
Microsoft Eco Business Park VIKulaiAnnouncednone publishedundisclosedMicrosoftLikely

Market pages

Other cities in Malaysia

Operators here with their own page

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.