SAIGONTEL AI Data Center, Nam Tan Tap IP

Tan Tap (Nam Tan Tap Industrial Park), Tay Ninh (former Long An), Vietnam · HCMC metro market · location approximate to district level

Also listed as Trung tâm dữ liệu AI Tây Ninh.

SAIGONTEL AI Data Center, Nam Tan Tap IP is a data center project in Tan Tap (Nam Tan Tap Industrial Park), Vietnam, operated by SAIGONTEL, World Harmony (WVU) and SAIF Eagle II. It has been announced and has not yet reached the land or permitting stage. It is planned for 100 MW of IT load.

Latest change on record: entered the record as announced on 28 August 2026. Record last checked against its sources on 17 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
100 MW
Running now
Not disclosed
Operators rarely publish this
Operator
SAIGONTEL, World Harmony (WVU) and SAIF Eagle II
Joint venture
AI workloads
Likely
Evidence grade
Sourced
Will it get built?Long shot0 of 7 gates passed
○ Land secured○ Power arranged○ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Land secured.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Vietnam approves, powers and taxes data centers is on Data center rules in Vietnam.

Where it sits

HCMC metro holds 10 active projects with 722 MW of planned IT load between them, and SAIGONTEL AI Data Center, Nam Tan Tap IP ranks third by planned capacity. Of those, 2 are operational, 1 is under construction, 5 are at the land and permitting stage and 2 are announced only. Published colocation vacancy in HCMC metro was 34.8% as of June 2026, on 33 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

It is the only SAIGONTEL project ArusGrid tracks. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as announced only on 28 August 2026. The money on record is US$3.5bn as of August 2026, the announced investment. Cooling uses direct liquid cooling.

Grid power for a large industrial user in Vietnam costs about US$0.073 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Vietnam, as of 27 September 2026, is recorded as “Licence required as enforced (Country Group D:1), no named authorisation found”. ArusGrid holds 2 public sources for this project, the latest dated 30 August 2026, and last checked the record on 17 October 2026.

How well evidenced is it

One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseYes
Three or more sourcesNo
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Presented as an AI data centre (trung tâm dữ liệu AI).

Access to AI chips

GradeNo public signal

Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required as enforced (Country Group D:1), no named authorisation found · Licence required as enforced (Country Group D:1), no named authorisation found (2026-09-27) source

Phases

Phase 1 · Announced100 MW, target 2027

Stage history

2026-08-28Announced · bnews.vn

Who is behind it

OperatorSAIGONTEL, World Harmony (WVU) and SAIF Eagle II · Joint venture

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2026-08US$3.5bn

Colocation price per kW of IT load per month

No published price band exists for Vietnam, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Water and cooling
CoolingDirect liquid cooling Reported source ↗
Direct liquid cooling and immersion cooling, up to 150kW per rack, as planned design.

Sources checked 2026-10-17

  1. Đề xuất xây dựng trung tâm dữ liệu AI 3,5 tỷ USD tại Tây Ninh (Bnews (VNA), 2026-08-28)
  2. SAIGONTEL joins international partners for $3.5 billion AI data centre complex in Tay Ninh (Vietnam Investment Review, 2026-08-30)

More in HCMC metro

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.