GSA Data Center 1 (Bang Phli)

Bang Phli, Samut Prakan, Thailand · Bangkok metro market · location approximate to district level

GSA Data Center 1 (Bang Phli) is a data center project in Bang Phli, Thailand, operated by GSA Data Center. It is operational. It is planned for 26 MW of IT load. The operator reports 26 MW running.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
26 MW
Running now
26 MW
Operators rarely publish this
Operator
GSA Data Center
Joint venture
AI workloads
Likely
Evidence grade
Verified
Thailand, 2026-09-24. Thailand asked developers on 4 September 2026 to pause 49 data centres under construction and froze 117 pending approvals while it writes new rules, due by mid October. The government has said it cannot legally enforce the pause. No list of affected projects has been published, so no Thai project has changed stage on this basis. A separate data centre electricity tariff has been created with no rate set.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (reported)Yes
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsNo

AI workloads

StatusLikely

Gulf Edge signed a master agreement with SIAM.AI (Nvidia Cloud Partner) to host NVIDIA compute at GSA; Gulf Edge also has a Google Cloud sovereign-cloud tie-up.

Who is behind it

OperatorGSA Data Center · Joint venture
Funder, Joint venture partnerGulf Development
Funder, Joint venture partnerSingtel
Funder, Joint venture partnerAdvanced Info Service (AIS)
Client, reported, unconfirmedSIAM.AI Cloud
Power supply
Dedicated substationGrid connection (utility not named) · 85 MVA · 115kV · Oct 2024 Confirmed source ↗
GSA offers tenants renewable energy certificates and procurement as an option. · On-site 115kV substation of 85 MVA for the 25.6MW Samut Prakan facility.
Water and cooling
WaterMains drinking water · Metropolitan Waterworks Authority (MWA) · 1,628.71 m³ a day Confirmed source ↗
Volume is expected cooling use in operation. About 20 m3 per day more for domestic use. Design PUE 1.4 per ADB release of 25 Aug 2025.
CoolingEvaporative cooling · design PUE 1.4 Confirmed source ↗
Cooling towers take make-up water.

Sources checked 2026-09-11

  1. gulf.co.th
  2. w.media
  3. gulfedge.co.th
  4. itnews.asia

More in Bangkok metro

Also run by GSA (Gulf/Singtel/AIS)

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-09-26.