Also listed as TCC Concept Pune data centre.
NES Data Hinjewadi 60MW campus is a data center project in Pune, India, operated by NES Data. It has been announced and has not yet reached the land or permitting stage. It is planned for 60 MW of IT load.
Latest change on record: entered the record as announced on 4 August 2026. Record last checked against its sources on 19 October 2026.
Next gate to watch: Power arranged.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How India approves, powers and taxes data centers is on Data center rules in India.
Pune holds 4 active projects with 255 MW of planned IT load between them, and NES Data Hinjewadi 60MW campus ranks third by planned capacity. Of those, 1 is operational, 1 is operational and expanding, 1 is at the land and permitting stage and 1 is announced only. Published colocation vacancy in Pune was 19.4% as of June 2025. Vacancy excludes hyperscaler self-build.
It is the only TCC Concept Limited project ArusGrid tracks. It sits on the NES Data Rajiv Gandhi Infotech Park. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The stage was recorded as announced only on 4 August 2026.
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 2 public sources for this project, the latest dated 5 August 2026, and last checked the record on 19 October 2026.
The announcement stands alone, or the project is on hold. The rules are fixed and published on the Methodology page.
No public signal either way.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
No figure has been announced. This range is 60 MW of planned IT load times a published benchmark of US$6.64 per watt for Mumbai, plus or minus 15 percent. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.
Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.
ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.
All projects in Pune · All projects in India · All projects announced only · Data center rules in India · Full directory