Directory › United Arab Emirates › Abu Dhabi › Khazna AUH8 Masdar City

Khazna AUH8 Masdar City data center

Abu Dhabi, United Arab Emirates · Abu Dhabi market · location approximate to district level

Khazna AUH8 Masdar City is a data center project in Abu Dhabi, United Arab Emirates, operated by Khazna Data Centers. It is under construction. It is planned for 30 MW of IT load.

Latest change on record: entered the record as under construction on 23 April 2025. Record last checked against its sources on 19 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
30 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Khazna Data Centers
Colocation
AI workloads
ai_ready_marketing
Evidence grade
Corroborated
Will it get built?Leaning yes4 of 7 gates passed
✓ Land secured○ Power arranged✓ Approvals granted○ Money committed○ Tenant or own use✓ Builder appointed✓ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How United Arab Emirates approves, powers and taxes data centers is on Data center rules in United Arab Emirates.

Where it sits

Abu Dhabi holds 7 active projects with 434 MW of planned IT load between them, and Khazna AUH8 Masdar City ranks 7th by planned capacity. Of those, 3 are operational and expanding and 4 are under construction. No third party publishes a colocation vacancy rate for Abu Dhabi, and ArusGrid does not estimate one.

Khazna has 6 others in the United Arab Emirates and 1 project elsewhere in the dataset tracked by ArusGrid, including Stargate UAE phase 1, Khazna Dubai Production City and Khazna QAJ1. It sits on the Masdar City campus. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as under construction on 23 April 2025. Cooling uses evaporative cooling.

The US export control position for advanced AI chips in the United Arab Emirates, as of 14 July 2026, is recorded as “Country Group A:5 with Supplement No. 8 approved end users”. ArusGrid holds 5 public sources for this project, the latest dated 1 May 2026, and last checked the record on 19 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

Status

Khazna describes AUH4 and AUH8 as AI-ready facilities (TechAfrica News 2025-04-23).

Access to AI chips

GradeNo public signal

Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectNo
Country-level export frameworkYes
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Country Group A:5 with Supplement No. 8 approved end users · Country Group A:5 with Supplement No. 8 approved end users (2026-07-14) source

Phases

AUH8 · Under construction30 MW, target 2026

Stage history

2025-04-23Under construction · techafricanews.com

Who is behind it

OperatorKhazna Data Centers · Colocation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Colocation price per kW of IT load per month

No published price band exists for United Arab Emirates, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Main contractorJames L. Williams (JLW) / McLaren Construction · US$240m · 2024 Reported source ↗
30MW AUH8 data centre, Masdar City
Water and cooling
CoolingEvaporative cooling Confirmed source ↗
Adiabatic free cooling. Designed to LEED Gold with modular construction.

Sources checked 2026-10-19

  1. Khazna Breaks Ground on Two New AI-Ready Data Centers in Abu Dhabi (TechAfrica News, 2025-04-23)
  2. Khazna expands footprint with two new data centers in Abu Dhabi (W.Media, 2025-04-22)
  3. UAE data center infrastructure gets a boost courtesy of Khazna (Enterprise AM, 2025-04-22)
  4. Khazna 30 MW AUH8 Data Centre (OGN News, 2026-05-01)
  5. Khazna breaks ground on two data centre facilities in Abu Dhabi (TradeArabia, 2025-04-21)

More in Abu Dhabi

Also run by Khazna

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.