ArusGrid tracks 2 active data center projects operated by Racks Central, with 165 MW of planned IT load, across Indonesia and Malaysia. Of these, 1 is under construction and 1 is at the land and permitting stage. Projects under construction or commissioning account for 70 MW.
ArusGrid classes the operator as colocation. Projects appear under the names Racks Central (Singapore). The largest project is Racks Central Batam (RCBI) at 95 MW in Batam and Bintan, at the land and permitting stage. AI workloads are confirmed at 1 site. Named funders across its projects are China-ASEAN Fund II (CAF II, ESR-linked). No tenant is disclosed at any of its projects, which is normal for colocation and says nothing about occupancy.
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| Racks Central Batam (RCBI) | Batam | Land and permitting | 95 | undisclosed | Racks Central | Likely |
| Racks Central Johor Campus | Pasir Gudang | Under construction | 70 | undisclosed | Racks Central (Singapore) | Confirmed |