ArusGridOperator
Directory › Operators › Nxera (Singtel)

Nxera (Singtel) data center projects

Singapore · dataset updated 2026-09-27

ArusGrid tracks 3 active data center projects operated by Nxera (Singtel), with 120 MW of planned IT load, across Singapore. Of these, 3 are operational. Disclosed running capacity is 58 MW.

ArusGrid classes the operator as telco. The largest project is Nxera DC Tuas at 58 MW in Singapore, operational. AI workloads are confirmed at 1 site. Named funders across its projects are Singtel and KKR. No tenant is disclosed at any of its projects, which is normal for colocation and says nothing about occupancy.

Open the mapRelationship graph

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
Nxera DC TuasSingaporeOperational5858Nxera (Singtel)Confirmed
Nxera DC WestSingaporeOperational41undisclosedNxera (Singtel)Unlikely
Nxera Kim Chuan 2SingaporeOperational21undisclosedNxera (Singtel)Unlikely

Markets where it builds

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.