ArusGrid tracks 1 active data center project in Other Thailand, Thailand, with 150 MW of planned IT load. It is at the land and permitting stage.
The operators with the most planned capacity here are Gorilla Technology (150 MW across 1 project). No third party publishes a colocation vacancy rate for Other Thailand, and ArusGrid does not estimate one.
Grid power for a large industrial user in Thailand costs about US$0.10 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Thailand, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”.
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| Gorilla Technology Korat AI Campus | Korat (Nakhon Ratchasima) | Land and permitting | 150 | undisclosed | Gorilla Technology Group | Likely |