ArusGrid tracks 2 active data center projects in Other Indonesia, Indonesia, with 0 MW of planned IT load. Of these, 2 are at the land and permitting stage.
The operators with the most planned capacity here are Indosat (1 project) and Komdigi (1 project). No third party publishes a colocation vacancy rate for Other Indonesia, and ArusGrid does not estimate one.
Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”.
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| Indosat / Nvidia AI Factory, Solo Technopark | Surakarta (Solo) | Land and permitting | none published | undisclosed | Indosat Ooredoo Hutchison | Likely |
| Pusat Data Nasional 3 (IKN / East Kalimantan) | Nusantara (IKN) | Land and permitting | none published | undisclosed | Kementerian Komunikasi dan Digital (Komdigi) | No signal either way |