No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy.
Power supply
Power allocation or planTuas Power · Mar 2025 Reported source ↗ Retail supply with local biomass, plus regional RECs and onsite solar; 100% RE coverage · Covers SIN1029A (SIN10), SIN11, SIN12 · Covers the operator's wider portfolio in this country, not this site alone.
Water and cooling
CoolingDirect liquid cooling Reported source ↗ CoolestDC direct-to-chip liquid cooling offered on bare metal servers at SIN11, retrofitted into an air-cooled facility
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedObayashi Singapore Pte Ltd · Design and build contractor · S$450m (≈US$338m) source ↗ This project is one of 2 that fit. The other is AirTrunk SGP1.
UnconfirmedTBH Consultancy · Engineering consultant source ↗ This project is one of 2 that fit. The other is AirTrunk SGP1.