ArusGridProject
Directory › Saudi Arabia › center3 Riyadh (Khurais)

center3 Riyadh (Khurais)

Riyadh, Saudi Arabia · Riyadh market · location approximate to city level

center3 Riyadh (Khurais) is a data center project in Riyadh, Saudi Arabia, operated by center3. It is operational and expanding. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
center3
Telco
AI workloads
No signal either way
Evidence grade
Verified

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesNo
Dated source in the last 24 monthsNo

AI workloads

StatusNo signal either way

Carrier-neutral colocation with no AI tenant, workload or cooling disclosure.

Access to AI chips

GradeNo public signal

Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria are published on the Methodology page.

Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Case-by-case authorisation only · Case-by-case authorisation only (2025-11-19) source

Stage history

2023-07-06Expanding · datacenterdynamics.com

Who is behind it

Operatorcenter3 · Telco
Funder, Equitystc Group

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-09-26

  1. STC's Center3 expands Riyadh data center in Saudi Arabia (DatacenterDynamics, 2023-07-06)

More in Riyadh

Also run by stc

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-09-26.