SentraForge AI Puri campus

Puri, Odisha, India · Other India market · location approximate to district level

SentraForge AI Puri campus is a data center project in Puri, India, operated by SentraForge AI (MEIL and GVPR Engineers JV). It has been announced and has not yet reached the land or permitting stage. The published capacity figure is 120 MW, and its basis is not stated as IT load.

Latest change on record: entered the record as announced on 24 September 2026. Record last checked against its sources on 3 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
120 MW
unstated
Running now
Not disclosed
Operators rarely publish this
Operator
SentraForge AI (MEIL and GVPR Engineers JV)
Local developer
AI workloads
Likely
Evidence grade
Corroborated

Where it sits

Other India holds 3 active projects with 120 MW of planned IT load between them, and SentraForge AI Puri campus ranks first by planned capacity. Of those, 3 are announced only. No third party publishes a colocation vacancy rate for Other India, and ArusGrid does not estimate one.

It is the only SentraForge AI project ArusGrid tracks. Named funding comes from Megha Engineering and Infrastructures (MEIL) and GVPR Engineers. No user of the capacity is on the public record as of 2026-10-03, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The stage was recorded as announced only on 24 September 2026. The money on record is INR 226.34bn (about US$2.6bn) as of September 2026, a government approval ceiling.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 5 public sources for this project, the latest dated 1 October 2026, and last checked the record on 3 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Announced as a sovereign AI data centre campus.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2026-09-24Announced · voicendata.com

Who is behind it

OperatorSentraForge AI (MEIL and GVPR Engineers JV) · Local developer
Funder, Joint venture partnerMegha Engineering and Infrastructures (MEIL)
Funder, Joint venture partnerGVPR Engineers

Who uses the compute

Checked on 2026-10-03. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Approved by a government investment agency, 2026-09INR 226.34bn (about US$2.6bn)

An approval figure is an incentive ceiling. It often covers a first phase and can exclude land or IT equipment.

The figure covers the whole campus.

Colocation price per kW of IT load per month

ArusGrid estimate, grade CINR 6,800 to INR 8,900 (about USD 81 to 106)

ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.

market band, hyperscale (2024-12)INR 6,800 to INR 8,900 Cushman & Wakefield for Sify Infinit Spaces, 2025-10-16
Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-03

  1. Odisha Clears Rs 2.47 Lakh Crore Investment Proposals as Data Centres Lead (Voice and Data, 2026-09-24)
  2. Odisha clears Rs 1.04 lakh crore Adani Group data centre park in Cuttack's Naraj (OTV, 2026-09-26)
  3. SentraForge AI, Backed by MEIL and GVPR, Gets Approval for Rs 22,634 Cr Odisha Campus (Whalesbook, 2026-10-01)
  4. Odisha's AI Employment Leap: SentraForge AI and Financial Anchor GVPR Rs 22,634 Crore Mega-Project (Indian Startup News, 2026-10-01)
  5. Adani firm gets approval for ₹1.04 trillion Odisha data centre park (Business Standard, 2026-09-25)

More in Other India

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. Dataset updated 2026-10-03.