SDAIA data center projects

Saudi Arabia · dataset updated 2026-09-27

ArusGrid tracks 2 active data center projects operated by SDAIA, with 500 MW of planned IT load, across Saudi Arabia. Of these, 1 is under construction and 1 is at the land and permitting stage. Projects under construction or commissioning account for 480 MW.

ArusGrid classes the operator as local developer. Projects appear under the names SDAIA (Saudi Data and AI Authority). The largest project is SDAIA Hexagon at 480 MW in Riyadh, under construction. AI workloads are confirmed at 1 site. Named funders across its projects are Government of Saudi Arabia. Disclosed tenants across its projects are Government of Saudi Arabia.

Open the mapRelationship graph

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
SDAIA HexagonRiyadhUnder construction480 *undisclosedSDAIA (Saudi Data and AI Authority)Confirmed
SDAIA Salboukh data centreSalboukhLand and permitting20undisclosedSDAIA (Saudi Data and AI Authority)No signal either way

Markets where it builds

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.