ArusGrid tracks 2 active data center projects operated by Microsoft in Indonesia, with 48 MW of planned IT load. Of these, 2 are operational and expanding.

Its Indonesia projects sit in Greater Jakarta. The largest is Microsoft JKT09 / JKT02 (KIIC Karawang campus) at 48 MW, operational and expanding. Disclosed tenants in Indonesia are Microsoft (own use). Outside Indonesia, Microsoft has 9 active projects on record in India, Malaysia and Singapore.

Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
Microsoft JKT09 / JKT02 (KIIC Karawang campus)Karawang (Karawang International Industrial City)Expanding48 *undisclosedMicrosoftConfirmed
Microsoft Indonesia Central data center (Jawa Barat)Cikarang, BekasiExpandingnone publishedundisclosedMicrosoftLikely

Markets

Microsoft in other countries

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.