ArusGridOperator
Directory › Operators › China Mobile Intl

China Mobile Intl data center projects

Thailand and Singapore · dataset updated 2026-09-27

ArusGrid tracks 2 active data center projects operated by China Mobile Intl, with 60 MW of planned IT load, across Thailand and Singapore. Of these, 2 are operational.

ArusGrid classes the operator as colocation and telco. Projects appear under the names China Mobile International and SUPERNAP (Thailand). The largest project is SUPERNAP Thailand (Chonburi) at 60 MW in EEC (Eastern Seaboard), operational. Named funders across its projects are China Mobile. No tenant is disclosed at any of its projects, which is normal for colocation and says nothing about occupancy.

Open the mapRelationship graph

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
SUPERNAP Thailand (Chonburi)Bo Win, Si Racha (Hemaraj Chonburi IE)Operational60undisclosedSUPERNAP (Thailand)Unlikely
China Mobile International SingaporeSingaporeOperationalnone publishedundisclosedChina Mobile InternationalNo signal either way

Markets where it builds

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.