ArusGrid tracks 2 active data center projects in Kuwait, Kuwait, with 0 MW of planned IT load. Of these, 1 is at the land and permitting stage and 1 is announced only.
The operators with the most planned capacity here are Google (1 project) and Microsoft (1 project). No third party publishes a colocation vacancy rate for Kuwait, and ArusGrid does not estimate one.
The US export control position for advanced AI chips in Kuwait, as of 27 September 2026, is recorded as “Licence required as enforced (Country Group D:4), no named authorisation found”.
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| Google Cloud Kuwait region (three sites) | Sulaibiya, South Saad Al-Abdullah and Al-Mutlaa | Land and permitting | none published | undisclosed | Google Cloud | No signal either way |
| Microsoft Azure Kuwait region | Kuwait (sites undisclosed) | Announced | none published | undisclosed | Microsoft | Likely |