ArusGridMarket
Directory › Kuwait › Kuwait

Data center projects in Kuwait

Kuwait · The Gulf · dataset updated 2026-10-18

ArusGrid tracks 2 active data center projects in Kuwait, Kuwait, with 0 MW of planned IT load. Of these, 1 is at the land and permitting stage and 1 is announced only.

The operators with the most planned capacity here are Google (1 project) and Microsoft (1 project). No third party publishes a colocation vacancy rate for Kuwait, and ArusGrid does not estimate one.

The US export control position for advanced AI chips in Kuwait, as of 27 September 2026, is recorded as “Licence required as enforced (Country Group D:4), no named authorisation found”.

Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
Google Cloud Kuwait region (three sites)Sulaibiya, South Saad Al-Abdullah and Al-MutlaaLand and permittingnone publishedundisclosedGoogle CloudNo signal either way
Microsoft Azure Kuwait regionKuwait (sites undisclosed)Announcednone publishedundisclosedMicrosoftLikely

Operators here with their own page

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. This page is generated from the dataset, so it cannot drift from the map.