ArusGrid tracks 5 active data center projects in Noida, India, with 189 MW of planned IT load. Of these, 2 are operational, 1 is operational and expanding and 2 are announced only. Operators have disclosed 32 MW actually running.

Noida sits in the NCR market, which is the level at which brokers publish vacancy and ArusGrid compares supply. The largest project is AdaniConneX Noida at 60 MW, operational and expanding. The operators with the most planned capacity here are AdaniConneX (60 MW across 1 project), NTT (53 MW across 1 project) and STT GDC (50 MW across 2 projects).

Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
AdaniConneX NoidaNoidaExpanding60 *10AdaniConneXLikely
NTT Noida 2 campusNoidaOperational5322NTT Global Data CentersConfirmed
STT Noida 3NoidaAnnounced28undisclosedSTT GDC IndiaNo signal either way
Sify Noida 02NoidaOperational26undisclosedSify Infinit SpacesLikely
STT Noida 2NoidaAnnounced22undisclosedSTT GDC IndiaNo signal either way

Market pages

Other cities in India

Operators here with their own page

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to [email protected]. This page is generated from the dataset, so it cannot drift from the map.